7.10.10

Testing patience....

Posted by Cath Swan |

Well after the last post where we were expecting to be moving in the next couple of weeks, we found out that Porter Davis had actually sent us the wrong email. So after giving notice on our current rental for a month ahead, we were a little concerned to find out the email sent to us was actually for someone else! Not exceedingly professional.


Thankfully, our final inspection date is scheduled for between the 15-19th October, settlement will then be in the next two or so weeks. We were informed that 'everything' has to be finished by the final inspection date, after that it's just getting final payment from the bank and any last minute fix up jobs. So we are now expecting to be in around the beginning of November.

Today our front doors are finally on with first coat of paint. The moulding on top of the render has gone on, all still to be painted but looks great.

They have done a whole house clean in preparation for putting the carpet down, so floors are clean, and all the windows were crystal clear.

We are now counting down the days!!

16.9.10

Moving forward.....

Posted by Cath Swan |

Quick post tonight as we're going away for a week holiday tomorrow.


Painting on all walls and ceilings and doors is now finished. The paint work in my humble opinion is quality. The finishes on all the room and cupboard doors is a beautiful glossy white. We're very happy with the finished painting. At a later date we will do some feature walls.

All the tiles have been delivered and look great, I can't wait to see them finished.

Our gorgeous front doors have been
delivered and will be painted a deep red called 'Manor Red', I had to fight for the style and colour so I'm really looking forward to seeing them up and finished.

And finally they have started preparing both the shower bases with waterproofing ready for the tiling on the shower floor and walls.

We are hoping that most of the tiling will be nearly finished when we return from our quick holiday in a week. We are hoping to be refreshed and ready for the big move and all that comes with our new house!

15.8.10

Lockup official!!

Posted by Cath Swan |

The house is officially at lockup!


Lots of little things finished around the house this week.

The kitchen is taking shape with the cabinets finished on the wall, the long island bench is sitting ready to be finished.

The Alfresco poles have been all finished now. We will be building a retaining wall along the footpath and getting fill to give us more space around the alfresco area. We will then build a fence behind it to give us privacy.

Below is our 'unpainted' double doors for our bedroom which are also in the theatre room. All our other doors in the house are single white panelled doors. Nice!

We are still yet to hear back from Porter Davis about the mortar colour mistake, hopefully this week something will be remedied!

17.7.10

Doors, bricks, & bath

Posted by Cath Swan |

On today's visit to our home we found a few new things.


The bricking has continued on the front of the house, and the garage is finished. It gave us an idea of how the bricks will look with the roof.

We are still unsure of the colour of the mortar as it's still drying and hoping they have the colour right, we picked the upgrade of off-white to go with the bricks. So time will tell.

We also found they had installed the laundry door and put some temporary doors on the front, until our beautiful red slat doors come.

They have also started on the bath and finished the frame for the fridge
space for the kitchen.

Very soon it will be at lockup stage, and in around twelve weeks give or take a couple, we will be moving in!