24.7.10

Bricks 'n' wiring

Posted by Cath Swan |


Today not much appeared to have changed from the first look at our home. But on closer inspection we noticed the brick infill to the top of the garage had been finished. This is an upgrade from the normal plaster board that is above the garage door.








The side and back of the house right around to the other side's alfresco area has been 3/4 of the way bricked as well.

We also found that as well as the electricals being finished, they had also done all the Telstra Smart-wiring. The cables had been put into
every room which we had chosen when we did all the electrical plans.

This hooks up all our phone, internet, television reception and Foxtel into the one system through the same cables.

So it's all coming along and getting closer to lockup stage.