This week the house is coasting along nicely.
They have installed all the cupboards and island bench for the kitchen. All the cabinets and drawers are in, and the kitchen sink has been delivered.

Not sure when the Caesar stone benches will arrive, but that and the appliances will finish off the kitchen.





The ensuite cupboards have been installed, notice they are also the same wood as the kitchen cupboards. We've kept the same look flowing through the house, with similar colours throughout.

This week the render will start on the front of the house, and the tiler will begin.

My husband finally met our Building Manager on Friday; he said they were flying along well. The Building Inspector came to survey the house and brickwork etc; apparently he was impressed with the quality of the house and immaculate brickwork and gave the big thumbs up!


The incorrect mortar colour has still been an issue. We have noticed that since the mortar has dried it looks a lot more grey which is unfortunate, but Porter Davis have agreed (after some haggling), to compensate us for their mistake. So we should be able to maybe get our driveway done at their expense!

The render will go from halfway up the window (in the picture above), down to the bottom, and then cover most of the portico.

Our Building Manager also informed us that because they are moving so quickly we could be in sooner than first thought. Our 20 week build guarantee from Porter Davis, put us as being in by mid October. It's now looking like we could be in around the end of September. That gives us a month! So today we started packing. Very exciting!!

8.8.10

Bricks done!

Posted by Cath Swan |

Greetings!! Busyness has overtaken me, so I haven't had a chance to update. But here is yesterdays offering.


We were very excited to see that they had almost totally finished all the bricks, all the way around the house. And it wasn't until my husband pointed out the portico pole finished that I realised they had finished the whole portico, (that is front entrance for you newbies)!
We now await to see what the render to the front post and bottom half of the front will look like.

Inside they have finished all the cornice for the ceiling, and
finished plastering all the ceiling areas. Including the doorway into the rumpus area, which is meant to actually be a 'doorway'! So tomorrow my husband will have to get the building manager to make sure that it is turned into a door frame.

They seem to be following the original plans and not the revised ones that we made, so we'll have to see why that keeps happening.

Other than a few niggly problems, everything is coming along very nicely!

4.9.09

Facade choice 2

Posted by Cath Swan |


After being disappointed at missing out on our 1st choice (see previous post), we were a little concerned that no-one had called to arrange any more colour appointments to keep the ball rolling. Turns out they were waiting for us to get back to them with our new choice of facade.


So yesterday we hastily picked our new choice of facade, all going well. We have chosen the Oakland! I really wanted a portico and this design has normal brick everywhere except the front pillars of the portico. I think it looks stylish. Of course a lot will depend on the bricks we choose.