21.8.10

Coming along.....

Posted by Cath Swan |



This week the house is coasting along nicely.
They have installed all the cupboards and island bench for the kitchen. All the cabinets and drawers are in, and the kitchen sink has been delivered.

Not sure when the Caesar stone benches will arrive, but that and the appliances will finish off the kitchen.





The ensuite cupboards have been installed, notice they are also the same wood as the kitchen cupboards. We've kept the same look flowing through the house, with similar colours throughout.

This week the render will start on the front of the house, and the tiler will begin.

My husband finally met our Building Manager on Friday; he said they were flying along well. The Building Inspector came to survey the house and brickwork etc; apparently he was impressed with the quality of the house and immaculate brickwork and gave the big thumbs up!


The incorrect mortar colour has still been an issue. We have noticed that since the mortar has dried it looks a lot more grey which is unfortunate, but Porter Davis have agreed (after some haggling), to compensate us for their mistake. So we should be able to maybe get our driveway done at their expense!

The render will go from halfway up the window (in the picture above), down to the bottom, and then cover most of the portico.

Our Building Manager also informed us that because they are moving so quickly we could be in sooner than first thought. Our 20 week build guarantee from Porter Davis, put us as being in by mid October. It's now looking like we could be in around the end of September. That gives us a month! So today we started packing. Very exciting!!

17.7.10

Doors, bricks, & bath

Posted by Cath Swan |

On today's visit to our home we found a few new things.


The bricking has continued on the front of the house, and the garage is finished. It gave us an idea of how the bricks will look with the roof.

We are still unsure of the colour of the mortar as it's still drying and hoping they have the colour right, we picked the upgrade of off-white to go with the bricks. So time will tell.

We also found they had installed the laundry door and put some temporary doors on the front, until our beautiful red slat doors come.

They have also started on the bath and finished the frame for the fridge
space for the kitchen.

Very soon it will be at lockup stage, and in around twelve weeks give or take a couple, we will be moving in!